Nice shiny new plant, but the most interesting thing to me was this "biblical" sized rebar-wire "weaving" machine that created the reinforcement mesh for the colossal concrete pipes.
The thing was was at least 20 feet tall; check out the rolling platform stand at the lower left for a sense of scale.
A few of the wire cylinders:
The sand & gravel conveyor belt:
No comments:
Post a Comment